Aluminum formwork is the best, versatile, and modern construction system. It suites both high and low rise facilities. The system is designed to optimize the creativity and allow rapid completion of several unit projects. It is used for a wide range of applications from straightforward panels to complex bay windows, AC hoods, and stairs. This system and Aluminum industrial profiles both are the backbones of construction sites.

The Aluminum formwork manufacturers put extra efforts in the production as to make the components light and simple. The simplicity and light weight of the components make it easy for the labor. It also minimizes the requirements for heavy lifting equipment.

Reasons Constructors Prefer Aluminum Formwork

There are several reasons that constructors prioritize formwork including:

  • It forms the complete concrete structure
  • It can be designed custom for project requirements
  • It offers great construction speed
  • The finish is high in quality
  • Mass production made cost effective
  • The panels are re-useable
  • The waste is low
    Aluminium formwork

    Aluminium formwork

Assembly

The formwork is simple and repetitive in nature which makes the process of assembling accurate for construction sequences. It cycles time fantastically in advance. It doesn’t require highly skilled and trained labor which reduces the burden from the skilled labor at times of shortage and overload.

The Aluminum formwork manufacturers make sure that every panel is labelled before it leaves the factory. Labelling makes the boards identifiable on site, and they can be fitted easily.

Pin And Wedge System

Simple pin and wedge system is used to hold the panels in position. This system passes through the outside ribs of panels to secure and fit panels without bracing. The only tool required is hammer and workers to construct the buildings quickly and easily.

The numbering of the panels also obsoletes the need of measurements. The erection process is manual, and tower cranes can concrete on other handling operations. It makes floor to floor construction possible in 4 to 5 days.

Prop Head

Quick strip prop head is the technical feature enabling the speed to be attained. In this principle, a V-shaped prop head is used due to which quick strip takes place while the propping is left undisturbed. It allows the re-use of deck panels immediately.

Wrap Up

When Aluminum forms are used the concrete finish is of high quality even without plastering, doors and windows are in position, and it allows doors and window frames to be installed directly with minimum need to resize.

The excellent quality Aluminum formwork panels manage consistency of the dimensions. When the formwork is removed, a high tolerance finish is produced requiring no plaster. It saves labor, cost, and time all at once making it the best choice for the ones directly involved in construction business.